Tirana- Currently works are focused on Lot II, Gjorm-Brataj-Ura e Laskos.
Every day are carried out dynamic tests and technical analysis for the substrate layer on different fragments.
In certain areas, monitoring processes have been increased due to some problems faced in the site. 

Meanwhile, works continues for the structural works along the axis.
The latter will serve as a connection point between the villages of Vlora, Vlora and Himara and beyond.
This road axis will enable a faster access to the coast for the residents of the city of Tepelena and other cities of Albania