15,000 farmers benefit from Myzeqe Agricultural Ring investment
Currently engineers are working in Imesht-Ngurrez segment. Works include bridges, structural works, fillings and other road adjustments. Works from Kashtbardha to Fier I Ri village are continuing with the stabilizer layer for almost 5.4 km. Meanwhile in residential areas works are focused in the construction of the sidewalks and side ditches.
TIRANA- About 45% of the reconstruction works of the Myzeqe Agricultural Ring (11 km long), have been completed. This concludes infrastructure investments in the agricultural area of Lushnje - Divjaka.
In this phase engineers are working in Imesht-Ngurrez segment. Works include bridges, structural works, fillings and other road adjustments. Works from Kashtbardha to Fier I Ri village are continuing with the stabilizer layer for almost 5.4 km. Meanwhile in residential areas works are focused in the construction of the sidewalks and side ditches.
Myzeqe Agricultural Ring connects the southern area of Lushnja with the Lushnje - Berat highway and Divjaka and Lushnja markets. The project is implemented by the Albanian Development Fund on behalf of the Albanian government. 15,000 residents mainly engaged in vegetable cultivation are the direct beneficiaries. This area is characterized by a high number of greenhouses. This road will help farmers transport their products to the Lushnja market faster and the products will have lower costs.
Meanwhile, within the year, ADF foresees to complete the Imesht-Ngurrez e Madhe segment and after 18 months the Fier-Ri-Kashtbardhe segment.
Other segments to be reconstructed are Saver-Kadiaj, Qerreti i Vjeter-Kadiaj, Qerret village and Qerret-Qerret i Vjeter.