According to statistics, the city of Korca continues to remain among the favourite tourist destinations. As such, it presents considerable opportunity for further growth of tourism in terms of hotel industry for development of guides. The Albanian Development Fund persists to replicate with its successful models of tourism centers, which are consolidated concepts and will continue to provide the best offers in the framework of hotel services and structures.
The facility, where works are taking place for Tourism Center in Korca, previously has been serving to maternity hospital but it will be adjusted to a hotel. In this way, depreciated old building is not left without function in the center of the city and its panorama is regenerated. The building has been reconceptualized, which will not only be a hotel but will also offer a number of other facilities, turning it into a multifunctional center that promotes tourism development and its cultural values.
It is located at “Fan Noli” boulevard and on its south is placed “6 Deshmoret” street.
So far, about 75% of the works has been completed
Floor 0: plumbing, electrical and air conditioning works have been completed. Also, the leveling layer and mesh on the walls have been finished.
1st floor: plumbing, electrical and air conditioning works have been completed. Next, the leveling layer on the entire surface of the floor and grout has been done.
2nd floor: electrical, plumbing, air conditioning, leveling layer, plaster walls and grout process have been completed.
3rd floor: electrical, plumping, air conditioning, leveling layer and grouting has been completed while skating process is continuing
Basement: plumbing and air conditioning works have been completed but it is still worked on the electrical installations.–
In the following, you can find further more detailed information on interventions of each floor:
Basement - It is estimated to be 210 m2 and will include a variety of auxiliary facilities (laundry, 2 technical rooms, tasting room etc.). It will also be accessed through 2 staircases and 2 elevators.
Ground Floor – a main entrance is estimated where it will be placed the lobby, which will also connect the main corridor. Through the ground floor will be accessed 6 rooms and the Workshop office. There is also an atrium that gives you a view of the basement.
First Floor – will contain 11 rooms, which can be accessed through 2 staircases and an elevator. At the end of the corridor, there will be a warehouse.
Second Floor – will be used for services. The conference room will be accessed through staircase, where is connected the main lobby, which also leads to the hall and the restaurant. Next, the restaurant will be divided into 2 halls and will be accessed through 2 stairs and an elevator.
Third Floor - will be like an "attic" because the roof is going to be a functional space. Therefore, the roof will be resided space and will contain 12 rooms. This floor will be accessed through 2 stairs and an elevator.