CONTRACT AWARD NOTICE
Employer: Albanian Development Fund (ADF)
Project: Regional and Local Roads Connectivity Project (RLRCP)
Contract title: “Construction of bridge no. 2, km 7+500, Fier – Seman Road”
Country: Albania
Loan No.: IBRD loan 8850-AL
RFB No: RLRCP/1/1.13/2021
Issued on: July 29, 2021
I. The selection method used: Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” July 2016, as amended.
II. The Bidders who submitted a Bid and the bid prices as read out and as evaluated:
No. |
Name of Bidder |
Bid price as read out, USD, net of VAT |
Bid price as corrected (if any), USD, net of VAT |
1. |
“4 A-M” shpk |
1,694,315.33 |
1,694,315.33 |
2. |
“Alb Building” shpk |
1,874,297.53 |
1,874,297.53 |
3. |
“Alb-Star” shpk |
2,015,850.08 |
2,015,850.08 |
4. |
“Strabag AG” |
1,909,386.25 |
1,909,386.25 |
III. The Bidders whose Bids were rejected and the reasons therefor: none.
IV. The Bidder submitting the successful Bid: “4 A-M” shpk
V. The Contract price: 2,033,178.4 US$ (VAT included).
VI. The duration and summary scope of the contract: The construction period is 6 months. This project lies in the central-southern area of Albania. The bridge is located in the segment Fier Seman Road and it is in the cross point of Seman and Darezeze village. There is actually an existing bridge crossing the big irrigation channel. The technical parameters of the bridge are not good, as the width is reduced and is a one lane bridge.
The Project consists of the construction of a new two span bridge, with two abutments and a central pillar. The beams will be tensioned. The geometry lay of the bridge will be parallel with the existing two segments which will facilitate the traffic and reduce hazardous traveling. The width of the bridge will be for two lanes in way to anticipate
VII. Successful Bidder’s Beneficial Ownership Disclosure Form