Contract Award Notice CWC/ICB/2017/2

 

Project Name: “Albania – Construction of Road

Gjorm Bridge – Brataj – Laskos Bridge in Selenica Region in Selenica Region”, CWC/ICB/2017/2

 

 

  • Name of each tenderer who submitted a Tender

 

  1. “Strabag” A.G.
  2. “Rawaed Al-Torok”
  3. “Kolin Insaat Turizm”
  4. “Alkelik Group” OSSC

 

  • Tender price as read out at Tender Opening

 

  1. “Strabag” A.G. – 4,387,356,668 ALL (VAT INCL)
  2. “Rawafed AL-Torok” – 5,410,026,497 ALL (VAT INCL)
  3. “Kolin Insaat Turzim” – 5,623,434,935 ALL (VAT INCL)
  4. “Alkelik Group” OSSC – 7,155,970,444 ALL (VAT INCL)

 

  • Name and evaluated prices of each Tender that was evaluated

 

  1. “Strabag” A.G. – 4,387,356,668 ALL (VAT INCL)
  2. “Rawafed AL-Torok” – 5,410,026,497 ALL (VAT INCL)
  3. “Kolin Insaat Turzim” – 5,623,434,935 ALL (VAT INCL)
  4. “Alkelik Group” OSSC – 7,155,970,444 ALL (VAT INCL)

 

  • Name and evaluated prices of alternative Tender

 

“Strabag” A.G. – 4,339,998,412.71 ALL (VAT INCL)

 

  • Number of tenderers whose Tenderers were rejected:

 

None

 

  • Wining Tenderer: “Strabag” A.G.

Address: Ortenburgerstrasse 27, 9800 Spittal/Drau, Austria

 

Contract Price: 4,339,998,412.71 ALL (VAT INCL)

 

Scope of Contract:Construction of Road Gjorm Bridge – Brataj – Laskos Bridge in Selenica Region in Selenica Region”, CWC/ICB/2017/2, is a road of length 27.1 km situated in rolling terrain. The estimated contract duration will be 24 months.