Reconstruction of the road Roskovec Poshnje
CONTRACT AWARD NOTICE
Employer: Albanian Development Fund (ADF)
Project: Regional and Local Roads Connectivity Project (RLRCP)
Contract title: “Reconstruction of the road Roskovec Poshnje”
Country: Albania
Loan No.: IBRD loan 8850-AL
RFB No: RLRCP/1/1.11/2020
Issued on: March 09, 2021
I. The selection method used: Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” July 2016, as amended.
II. The Bidders who submitted a Bid and the bid prices as read out and as evaluated:
No. |
Name of Bidder |
Bid price as read out, ALL, net of VAT |
Bid price as corrected (if any), ALL, net of VAT |
1. |
“Alb-Star” shpk |
610,806,155 |
732,967,386 |
2. |
“Avtomagistrali – Tcherno More JSC – Schumen” |
579,859,450 |
695,831,340 |
3. |
“Cemil Ozgur Insaat Sanayi Ve Ticaret AS” |
515,180,060 |
618,216,072 |
4. |
“Gener 2” shpk |
756,046,835 |
907,256,202 |
5. |
“Green Line General Trading and Contracting CO.W.LL” |
489,777,115 |
587,732,538 |
6. |
“Rawafed Al-Torok Contracting Establishment” |
581,835,850 |
698,203,020 |
7. |
“Salillari” shpk |
571,031,410 |
685,237,692 |
8. |
“Trace Group Hold plc” |
775,273,258 |
930,327,910 |
9. |
JV “4 A-M” shpk & “Makimsan Asfalt Taahhut Insaat Sanayi Ve Ticaret AS” |
473,213,798 |
567,856,558 |
10. |
JV “G.P.G. Company” shpk & “Gjikuria” shpk |
461,899,170 |
554,279,004 |
11. |
JV “Trema Engineering 2” shpk & “Starbag AG” |
468,182,056 |
561,818,467 |
III. The Bidders whose Bids were rejected and the reasons therefor:
IV. The Bidder submitting the successful Bid: JV “G.P.G. Company” shpk & “Gjikuria” shpk
V. The Contract price: 554,279,004 ALL (VAT included).
VI. The duration and summary scope of the contract: The construction period is 12 months. This project lies in the central-southern area of Albania. This segment has the number Sh-73 and connects the national road SH-4 with the city of Berat. This project includes the districts of Fier and Berat. The population under this project is 50,000 inhabitants.
The road to be reconstructed is 13,019 km long; it starts at the Patos Intersection of the district and district of Fier and ends at the Intersection of this road with the Berat-Lushnje road. This whole segment crosses Roskovec, Strume, Kutalli, Rerez until the roundabout of Poshnja.
VII. Successful Bidder’s Beneficial Ownership Disclosure Form