CONTRACT AWARD NOTICE

 

Employer: Albanian Development Fund (ADF)

 

Project: Project for Integrated Urban and Tourism Development (PIUTD)

 

Contract title: “Civil works for ntegrated Urban Upgrading of Ksamil Touristic sites and adjacent areas (City Square and Promenade Phase 1”

 

Country: Albania

 

Loan No.: IBRD loan 93260-AL

 

RFB No: AL – ADF – 462499 – CW – RFB

 

Issued on: February 07, 2025

 

  1. The selection method used: Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” July 2020 as revised (“Procurement Regulations”), and is open to all Bidders as defined in the Procurement Regulations.

 

  1. The Bidders who submitted a Bid and the bid prices as read out and as evaluated:
No.
Name of Bidder
Bid price as read out, net of VAT
Bid price as corrected (if any) VAT incl
1.
JV Fusha sh.p.k & Gjikuria sh.p.k.
5,124,927.12 EUR
6,149,912.55 EUR
2.
“4 A-M” shpk
833,651,606.55 ALL
1,000,381,927.86 ALL

 

  • The Bidders whose Bids were rejected and the reasons therefor:
  1. The Bidder submitting the successful Bid: JV Fusha sh.p.k & Gjikuria sh.p.k.”4 A-M” shpk
  2. The Contract price: 6,149,912.55 (VAT included).
  3. The duration and summary scope of the contract: The construction period is 12 months.

The Final Design for Ksamil Lot 1- of the promenade rejuvenation project preserves the existing corridor, transforming it into a continuous linear structure integrated with strategically placed functional interventions.

 

Key elements include a defined entrance gateway, an optimally located bus stop for enhanced transit connectivity, a dedicated pool area, separate stair installations for vertical access, an extended pier facilitating waterfront integration, a basketball court, and a mini square serving as a social node.

 

Additionally, the main square adjacent to Tirana Bank is renovated to act as a central spatial anchor. These architectural interventions collectively create a cohesive,

 

multifunctional pathway that adheres to urban design standards, ensuring visual harmony and programmatic efficiency along the promenade.

 

The project is structured around a central axis, which corresponds to the main road of the town. This axis will undergo significant enhancements to improve traffic flow, pedestrian accessibility, and overall urban experience. The promenade’s design focuses on maintaining a coherent visual identity while ensuring functionality through meticulous planning and adherence to design principles. This approach will create a harmonious and visually striking public space that integrates sea messily with its urban and costal surroundings. Demolition and reconstruction of the retaining walls in the left and right directions of the pedestrian walkway according to the respective progressives.

 

The pedestrian walkway is illuminated throughout its length. The type of lighting is given in the electrical project. It will also be surrounded by greenery throughout its length. Utilization of materials like washed concrete in white and grey, and decomposed granite for public spaces.

 

  • Successful Bidder’s Beneficial Ownership Disclosure Form