CONTRACT AWARD NOTICE
Employer: Albanian Development Fund (ADF)
Project: Regional and Local Roads Connectivity Project (RLRCP)
Contract title: “Reconstruction of the road “Pogradec-Tushemisht”
Country: Albania
Loan No.: IBRD loan 8850-AL
RFB No: RLRCP/1/1.2/2018
Issued on: May 20, 2018
I. The selection method used: Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” July 2016, as amended.
II. The Bidders who submitted a Bid and the bid prices as read out and as evaluated:
No |
Name of bidder |
Bid Price as read out ALL (VAT included) |
Bid Price as read out after discount ALL (VAT included) |
Bid Price as evaluated ALL (VAT included) |
1 |
JV “4 A-M” shpk & “Garden Line” shpk |
377,388,382 |
—– |
377,388,382 |
2 |
“Albavia” shpk |
618,021,194 |
—– |
618,021,194 |
3 |
JV “EUROKOS HOLDING” shpk & N.N.T.SH. “DRINI COMPANY” shpk |
407,792,394 |
—– |
407,792,394 |
4 |
JV “Factory Karposh JSC Skopje” & “Civil Engineering institute MACEDONIA JCS Skopje” |
595,198,690 |
416,639,084 |
595,198,690 |
5 |
JV “G.P.G. Company” shpk & “Gjikuria” shpk |
448,328,378 |
—– |
448,328,378 |
6 |
“Gjoka Konstruksion” sha |
572,702,578 |
—– |
572,702,578 |
7 |
“PE-VLA-KU” shpk |
615,309,668 |
—– |
615,309,668 |
8 |
“Rawafed Al-Torok Contracting Establishment” |
431,280,369 |
—– |
431,280,369 |
9 |
“Salillari” shpk |
376,105,906 |
—– |
397,169,664 |
10 |
JV “Vellezerit Hysa” shpk & “Curri” shpk |
448,808,969 |
—– |
448,808,969 |
III. The Bidders whose Bids were rejected and the reasons therefor;
- JV “EUROKOS HOLDING” shpk & N.N.T.SH. “DRINI COMPANY” shpk
The JV member N.N.T.SH. “DRINI COMPANY” shpk is debarred from 15 September 2018 to 21 June 2021.
IV. The Bidder submitting the successful Bid: JV “4 A-M” shpk & “Garden Line” shpk. Adr. “Artan Lenja”, P. i 4 A-M, K. 1, Ap. 1, Tirana.
V. The Contract price: 377,388,382 ALL (VAT included).
VI. The duration and summary scope of the contract: The construction period is 8 months. The project aims full reconstruction of Pogradec -Tushemisht road. The construction services required consist on: road reconstruction, urban improvement and upgrading works, landscape rehabilitation works. The road reconstruction will increase surrounding asset value, ease area access and mobility for local habitants and accessibility to the castle by tourists.
The required works under this contract consist mainly on; earth movement and excavation, laying and compaction of road subgrade layers, asphalt works, utility works, concrete and reinforcement, and landscaping works.
The Site is located at Pogradec municipality.
VII. Successful Bidder’s Beneficial Ownership Disclosure Form