Notification of Prequalification Results CWC/ICB/2018/3
Notification of Prequalification Results
Name of Procuring Entity: Albanian Development Fund
Name of Project: Rehabilitation of the Vlora River Road Project
Project – ID: 943
Tender/Contract Description: Reconstruction of road Laskos Bridge – Qeparo and Laskos Bridge – Kuç connection road, in Himarë Region CWC/ICB/2018/3
No. |
Applicants Prequalified |
Nationality of Applicant |
1. |
Rawafed AL-Torok |
Saudi Arabia |
2. |
Alke Inshaat Sanaye ve Tijarat OJSC |
Azerbaijan |
3. |
INC |
Italy |
No. |
Applicants Prequalified Conditionally |
Nationality of Applicant |
Condition for Qualification |
1. |
Nurol |
Turkey |
The bidder shall be requested to submit the actual status of the current commitments and on-going contracts amount. |
2. |
Kolin Insaat Turizm Sanayi ve Ticaret |
Turkey |
The bidder shall be requested to submit the power of attorney which was missing in the application file. |
No. |
Rejected Applicant |
Nationality of Applicant |
Reasons of Rejection |
1. |
JV “Sadeem Al Kuwait & Gener 2” |
Kuwait/Albania |
– Documents are not legalised or apostil stamped.
Fails to fulfil the specific volumes criterion. Earthworks: 1,330,202/1,650,000 m3 |
2. |
Combined Group Contracting Co |
Kuwait |
– Fails to fulfil the specific volumes criterion.
Earthworks: 330,000/1,650,000 m3 Sub base: 76,172/100,000 m3 Crushed stone: 19,619/77,000 m3 Asphalt: 24,485/110,000 T |
3. |
Sintram S.A. |
Morocco |
Fails to fulfill the similar contracts criterion. The projects submitted have lower contract amount than the criterion or are executed out of the requested period. |
4. |
IL&FS Transportation Network Limited |
India |
– Fails to fulfil the similar contracts criterion 2 similar contracts out of 5 submitted.
– Power of attorney is missing – Fails to comply with the outstanding works criterion. The references for the executed volumes are released from the concession companies or prime contractors. |
5. |
Akkord |
Azerbaijan |
– Fails to fulfil the similar contracts criterion. Has only one similar contract out of three submitted. (Did not submit any supporting documents for all the contracts)
– Fails to comply with the outstanding works criterion. Did not declare any volume for concrete works. |
6. |
Terna |
Greece |
– Fails to comply with the outstanding works criterion.
The certificates of the volumes are released from the concession companies or prime contractor. All the supporting documents for the contracts are not legalized or apostil stamped. |
7. |
JV “Eksan” & “Dogusan” |
Turkey |
– Fails to comply with the outstanding works criterion.
Fails to fulfil the similar contracts criterion. None of the similar contracts out of 11 submitted for EKSEN fulfils the criterion and none of the similar contracts out of 8 submitted by DOGUSAN fulfils the criterion. |
8. |
KCC Engineering & Contracting CO |
Kuwait |
– Fails to fulfil the similar contracts criterion 1 similar contracts out of 10 submitted.
– There is not any information regarding the volumes executed. – Didn’t submit any supporting documents, contracts, IPCs. – Fails to comply with the outstanding works criterion. – Bank statement is not original – Apostil stamps are missing Didn’t fill the application forms as per standard. |