CONTRACT AWARD NOTICE

 

Employer: Albanian Development Fund (ADF)

 

Project: Community Works IV: Development of the Albanian Alps and Coastal Areas

 

Contract title: “Reconstruction of the central boulevard “Ismail Qemali”, Vlore”

 

Country: Albania

 

Loan No.: ALB – LD 1853

 

RFB No: CWPIV/W/OP/2017/14

 

Issued on: February 27, 2018

 

  1. The duration and summary scope of the contract:The construction period is 10 months. The Works consist on construction, urban regeneration and upgrading works in Vlora. This contract is first part of Reconstruction of the central boulevard “Ismail Qemali” which aims to transform the boulevard into a majestic grand boulevard that runs from the city entrance to the sea, the Port Vlore, sea promenade and the National Museum of Independence.

    Required works are mainly earth works, concrete works, paving works, site systematization, urban lighting installation, urban furniture works, landscaping and greenery works.

    The Site is located at Vlora municipality.

 

  1. The selection method used:The Most Advantageous Bid.

 

III. The Bidder submitting the successful Bid: “Fusha” shpk. Adr. Rr. “Murat Toptani”, nr. 25, Tirana.

 

  1. The Contract price of the successful Bid:233,261,262 ALL (net of VAT) – 279,913,514 ALL (VAT included).

 

  1. The Bidders who submitted a Bid:
    1) “Fusha” shpk
    2) “Curri” shpk

 

  1. The bid prices as read out at opening of financial parts of bids:
    1) “Fusha” shpk – 233,261,262 ALL (net of VAT) – 279,913,514 ALL (VAT included).

 

VII. The bid prices as evaluated: 
1) “Fusha” shpk – 233,261,262 ALL (net of VAT) – 279,913,514 ALL (VAT included).

 

VIII. The unsuccessful bidders and the reasons the bids were unsuccessful: 

1) “Curri” shpk 

The bid does not meet the qualifying criteria, conforming to all the terms, conditions and specifications of the Bidding Documents as follows:

4.2.b) Specific Construction Experience. The criterion is not fulfilled.

The Bidder fails to fulfill the sub-requirement for Stone tiles works: Bidder has submitted in the form the amount of 30,000 m2 executed in the contract: “Reconstruction of Vlora ring road lot 1”. This contract was implemented by ADF and no stone tile works were foreseen or executed.

The Bidder fails to fulfill the sub-requirement for Tree planting: The bidder has submitted in the form the amount of 1,700 trees planted in the contract: “Reconstruction of Vlora ring road lot 1”. In the IPC submitted are 1,200 planted trees as opposed to the 1,600 requested.